Follow the link(s) below to download white papers regarding specific Continental Power Corporation commercial installations.
Sand & Gravel White Paper 2-3-10.pdf
Synopsis: Continental Power delivered a proposal for the installation of six CPS PowerwoRx units to be installed at a sand and gravel plant. The PowerwoRx System Cost was quoted at $31,170.00 with a projected annual savings of $11,276.00 due to a projected 8% reduction in electricity consumption. Payback for the equipment would be in 33.17 months. The 10 year warranty period return amounted to $112,760.00 for a 362% Return on Investment (ROI). A large percentage of the electric bill for this plant
was in powering numerous conveyors. Many of the motors to these conveyors required long electrical leads and loads on the conveyors themselves varied depending upon tonnage for a particular day.
| Attachment | Size |
|---|---|